Industrial Building Group is pleased to announce we have been awarded the design build contract for Phase 1 of BGPF International Group’s Cold Storage Facility in Baytown, Texas.
Phase 1 includes a 282,000 SF freezer distribution facility. Groundbreaking was on April 10, 2023, and the expected opening is June 12, 2024.
This is Industrial Building Group’s third building for the BGFP Group. The design build team includes RKB Architects, Providence Engineering, and Stoneridge Engineering.
By Matthew K
Recent Articles
Quick Links
Resources
Locations
620 Division St. Elizabeth, NJ
125 Commerce Way Marshfield, MA
All Rights Reserved | Industrial Building Group